L&T Wins Contract for Brahmaputra Cable-Stayed Bridge in Assam
Larsen & Toubro (L&T) has announced that its construction arm has secured a substantial contract for the construction of a 12.21 km-long cable-stayed bridge spanning from Palashbari to Sualkuchi across the Brahmaputra river in Assam. The project, awarded by the state’s Public Works Department (PWD), falls within the ₹2,500 crore to ₹5,000 crore range. The […]
The post L&T Wins Contract for Brahmaputra Cable-Stayed Bridge in Assam appeared first on SSMB.