Transforming Kolkata: Orange Line Metro Expansion
Construction on Kolkata Metro’s Orange Line is making significant strides, poised to revolutionize commuting between New Garia and Netaji Subhas Chandra Bose International Airport. Currently operational on a 5.40 km stretch from Kavi Subhash to Hemanta Mukhopadhyay, the metro is preparing to extend 4.39 km further to Beleghata station pending safety clearances. This expansion addresses critical transportation needs for Kolkata’s 14.8 million residents, promising to alleviate traffic congestion and enhance connectivity across the city.
The ongoing development of the remaining 9 km stretch, nearing 90% completion, underscores the project’s scale and importance. This section will introduce 10 new stations equipped with state-of-the-art amenities such as escalators, lifts, and tactile flooring, ensuring accessibility for all passengers, including those with disabilities. The metro’s expansion is expected to not only streamline daily commutes but also catalyze economic growth by improving access to key residential and commercial areas.
Moreover, the Orange Line’s impact extends beyond transportation efficiency. It is poised to elevate real estate prospects along its route, with properties within proximity to new stations likely to witness increased demand and value appreciation. This development presents a compelling opportunity for investors and residents seeking prime locations with enhanced connectivity and lifestyle amenities.
Overall, the Kolkata Metro’s Orange Line project signifies a transformative leap in the city’s infrastructure, promising a more connected, accessible, and dynamic urban landscape for its residents and visitors alike.
The post Transforming Kolkata: Orange Line Metro Expansion appeared first on SSMB.