fbpx

Cladding Subcontractor Sentenced with Principal Contractor After Worker Injury

A CLADDING SUBCONTRACTOR has been sentenced along with a principal contractor after a worker was hospitalised for nearly two weeks.

The man was working as a lift supervisor at a construction site at Eskdale Terrace, Jesmond, Newcastle, on 22 January 2020 when he was struck by a 124kg panel.

The worker had been using a tower crane to lift the structural insulated panel (SIP). During the lifting operation, the SIP struck steelwork and fell on top him.

The man spent 13 days in hospital following the incident after fracturing his collarbone, shoulder blade, left ankle and left rib.

Failed Safety Measures

An investigation by the Health and Safety Executive (HSE) found Tolent Construction Limited, the principal contractor, had failed to properly plan, manage and monitor the construction phase. This resulted in a failure to ensure a suitable and sufficient lift plan was in place for the lifting of individual SIPs. Most importantly, the lift plan failed to stipulate how the individual SIPs were to be safely lifted and failed to consider proximity hazards or how the SIPs would be adequately controlled during the lifting operation.

HSE’s investigation also identified Clad Build UK Limited (trading as SIP Build UK), as the contractor responsible for the design, supply and installation of the SIPs.

Clad Build UK Limited failed to plan, manage and monitor the work or to provide the necessary information and instruction to workers on how to prepare the SIPs for lifting. Clad Build UK Limited also failed to ensure effective supervision and monitoring of work being undertaken by a subcontractor working under its control and to comply with requests for information from the principal contractor.

The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) can be accessed here.

Contractors Sentenced

Tolent Construction Limited of Grey Street, Newcastle, pleaded guilty to contravening Regulation 13 (1) of the Construction (Design and Management) Regulations 2015. The company was fined £1,000 and ordered to pay £8,468.50 in costs at Newcastle Crown Court on 17 April 2023.

Clad Build UK Limited of Foxbridge Way, Normanton Industrial Estate, Normanton, West Yorkshire, pleaded guilty to contravening Regulation 15 (2) of the Construction (Design and Management) Regulations 2015. The company was fined £12,000 and ordered to pay £45,000 in costs at Newcastle Crown Court on 17 April 2023.

HSE inspector Stuart Whitesmith said: “HSE will not hesitate to take enforcement action against those that fall below the required standards. This case should raise awareness of the dangers of failing to properly plan and safely carry out this type of lifting operation. SIPs are increasingly used in the construction industry and all contractors should be aware of the need to suitably plan, manage and monitor their safe installation.”

Guidance on managing health and safety in construction is available here.

 

>> Read more of the latest news

The post Cladding Subcontractor Sentenced with Principal Contractor After Worker Injury appeared first on Roofing Today.

Generated by Feedzy