Giant dome lifted onto Hinkley C reactor building – video
Engineering teams have lifted the 245-tonne steel dome capping the first Hinkley C reactor building. The delicate 90-minute heavy lift by the Big Carl crane saw the dome, wider than St Paul’s cathedral, lifted onto the 44m tall first reactor building. EDF’s nuclear island director Simon Parsons said it as a fantastic night with smiles
